Genesi Home Home Projects Forums
Login
Username:

Password:

Remember Me
 
[Register an Account]

Developer Programs
Efika 5200B
Efika 8610
Efika 5121E
Coldfire MCF54455

Search Projects

Google

TetraPower 970MP Project
Elastic Interface Tuning

in category Other
proposed by Bruce Boettjer on 1st March 2006

Project Proposal
Once the processor(s) are physically attached to the NorthBridge, a \'tuning\' procedure must be accomplished that sets latency parameters on the EI bus such that both normal access as well as cache-coherency messaging work properly.

This tuning procedure is non trivial and the IBM documentation is wrong. There are simply too many variables to control without having some sort of knowledge about what each variable controls, as well as knowledge of the internal circuitry of the processors and bridge.

Every physical design (each new PCB) must go through this procedure. Even minor spins of the same PCB will sometimes require re-running this procedure.

Processors will not come out of reset until this procedure is accomplished correctly.

Project Blog Entries

No blog entries for this project

PowerDeveloper.org: Copyright © 2004-2008, Genesi USA, Inc. The Power Architecture and Power.org wordmarks and the Power and Power.org logos and related marks are trademarks and service marks licensed by Power.org. All other names and trademarks used are property of their respective owners. Privacy Policy